Overview of Past Facilities Projects

  • Facilities Equalization, Phase 1

    In 2008, the school district began "Phase 1" of a Facilities Equalization Project to update and equalize the facilities throughout the district. Between 2008-2012, the following facilities projects were completed:

    ATEC Partial HVAC upgrade; Welding classroom - new ventilation system installed
    Blaney Elementary Complete renovation (addition of 6 classrooms and expansion of library/media center, beyond Phase 1 projects)
    CLC Drainage and window replacement
    Camden High Athletic facilities and auditorium; added well for existing irrigation systems (for long term cost savings)
    Camden Middle New facility; added well for existing irrigation systems (for long term cost savings)
    Jackson School New facility; added well for existing irrigation systems (for long term cost savings)
    Lugoff Elementary Paving, painting, landscaping, and new window blinds
    Lugoff-Elgin Middle New facility; added well for existing irrigation systems (for long term cost savings)
    Lugoff-Elgin High Athletic facilities; new stadium light poles and system; lights added to practice fields; added well for existing irrigation systems (for long term cost savings)
    Lugoff-Elgin High Annex Roof replacement, HVAC upgrades, Painting, and Paving
    Midway Elementary Complete renovation/addition of art room, music room, multipurpose room and rest rooms
    North Central High Athletic facilities and auditorium; paving and fencing; lights added to practice fields; added well for existing irrigation systems (for long term cost savings)
    North Central Middle New construction of multi-purpose room; new science tables
    Stover Middle Multi-purpose room and field renovations; restroom wall repairs; new science tables
    District Office Facility Facility purchase at $28 per square foot (2029 West DeKalb Street)

     

     
    New Construction prior to Phase 1
     
    A few other schools have had new construction of their facilities within the past 15 years through facilities projects prior the the Phase 1 Facilities Equalization. Those schools are:
     
    Doby's Mill Elementary New facility was constructed in 2002. The property has a one-story building containing a total of 78,000 square feet on a site of approximately 30 acres.
    North Central Middle New facility was constructed in 2002. The property has a one-story building containing a total of 78,000 square feet on a site of approximately 30 acres.
    Pine Tree Hill Elementary New facility was constructed in 2002. The property has a one-story building containing a total of 78,000 square feet on a site of approximately 30 acres.
    Stover Middle New facility was constructed in 1999, with a gymnasium addition in 2002. The property has a one-story building containing a total of 124,000 square feet on a site of approximately 23.978 acres.